OFF CENTER REACH FOR TOWER & LUFFING CRANES v0.1

COMPANY:          PROJECT:   
CRANE MAKE AND MODEL:         Meters Feet
Distance from Centerline of rotation to boom foot pins
Distance from bottom of tracks or tires to boom foot pins
Boom, centerline to bottom
Boom width
Boom angle, degrees
Clearance between the side of the boom and the structure
Jib Depth
Jib Length
Jib Offset, degrees TIP: Change jib offset to increase/decrease boom length
Structure height
Distance from the structure to centerline of rotation
Depth of the structure
Off Center Width

OUTPUT FROM THE PLAN SKETCH:
Reach across the structure
Diagonal distance from structure to the centerline of rotation
Operating Radius: This is the same operationg radius as the jib
OUTPUT FOR THE BOOM IN COMBINATION WITH A JIB:
Boom length required
Reach across the structure for the boom
Distance Above Structure to boom tip sheaves
Operating Radius for the boom
Clearance between the bottom of the boom and the structure
OUTPUT FOR THE JIB:
Reach of the jib
Jib angle with the horizontal
Distance above the structure to the Jib tip sheave
Clearance between bottom of jib and structure
Operating Radius of the Jib

Note: